1. Maintain good lubrication of each rotating part, and must load oil once per shift;
2. Each grounding conductor should be inspected frequently and kept well grounded;
3. Always check the fastening bolts for looseness;
4. Check the oil quantity of the fuel tank, and it should be replenished in time when it is lower than the liquid level;
5. Always check the high-pressure hose, if it is damaged, it should be replaced in time;
6. The hydraulic oil should be kept clean and replaced regularly. The oil tank and filter should be cleaned every time the oil is changed.
7. The backup pump of the water supply system should be exchanged and used regularly to avoid rusting if not used for a long time;
8. Identify and train full-time operators, untrained personnel are not allowed to work;
9. When the cooling water pressure and water temperature exceed the set value, the fault must be eliminated before continuing operation.
10. Protection against electric shock
a. Protection shall comply with the relevant provisions of GB J65-83 "Code for Design of Grounding for Industrial and Civil Power Equipment";
b. For other protections, operators should wear personal protective equipment such as insulated gloves, insulated shoes, protective caps and goggles, and protect them from moisture and moisture to prevent accidents from electric shock.
c. When servicing power supplies, capacitor cabinets, and furnaces, turn off the power and do not work.