Bridge shell medium frequency induction heating furnace
Steel tube heating furnace
Bar intermediate frequency induction heating furnace
1000KW bar medium frequency induction heating furnace
induction metal heater
medium frequency induction heating machine
medium frequency semi-automatic heating furnace
medium frequency induction heating furnace
medium frequency heating furnace
A, the workpiece parameters and process requirements of the intermediate-frequency induction heating furnace of the bridge shell
name | Specifications and requirements | Remarks |
Heating material | 16 manganese steel, Q4200B,etc. | |
heating method | Overall diathermy | |
Final heating temperature | 900-920 °C ± 20 °C | |
Maximum billet | Length 1640mm Width 520 mmThickness 16 mm ( 14 mm ) | |
Single piece blank weight ( MAX ) | 60Kg | |
Blank width range | 268~415mm | |
Production program | 160,000 pieces / year Single136 seconds / piece | Two shifts |
Power supply | 750kW | Single |
B, the composition of the intermediate-frequency induction heating furnace of the bridge shell is shown in the following table.
sequence | content | Quantity | Remarks | |
1 |
Intermediate frequencyheating section | low voltage switch box | 2 sets | Each unit is assembled with each IF power cabinet |
Medium frequency power supply KGPS 75 0 /6.0 K Hz | 2 sets | |||
Compensation capacitor cabinet | 2 sets | The induction heating furnace is mounted on the compensation capacitor cabinet | ||
Induction heating furnace GTR 40 | 2 sets | Rectangular lateral feed with an opening height of 40mm . | ||
Connect copper bars or cables | 2 sets | Length depends on the site | ||
2 |
Mechanical transmission part | Roller feeding mechanism | 2 sets | |
Electromagnetic suction device | 2 sets | |||
Parallel mobile trolley | 2 sets | |||
Pneumatic pushing mechanism | 2 sets | |||
Rapid discharge mechanism | 2 sets | |||
Two-way power conveyor roller | 1 set | |||
Material limit device | 2 sets | |||
Double rod pneumatic positioning device | 1 set | |||
Feeding robot | 1 set | |||
3 |
Control section | Infrared Thermometer | 2 sets | Installed in the sensor outlet |
Temperature display instrument | 2 sets | Mounted on the operating cabinet | ||
PLC | 2 sets | Mitsubishi Qseries (or 3units) | ||
Proximity switch | Multiple | |||
Photoelectric switch | 4 sets | |||
External console | 1 set | |||
connecting cables | 1 set | Length depends on the site | ||
4 | Cooling section | Pure water water -water cooler | 2 sets | FSS-350 |
2 cubic meters of water storage tank | spare | |||
5 | spare parts | See the table below | ||
6 | Mounting material | According to detailed design and on-site conditions | 1 set | |