Installation of medium frequency furnace body
The installation procedure for the furnace body is specified on the drawings. The first is to install the hob on a flat base, then install the furnace cylinder and furnace body. If there is a weighing device, it should be installed in the specified position according to the drawings. The bracket of the furnace (for the 坩埚-type induction furnace including the fixed bracket and the movable bracket) and the part of the furnace body, during the processing, the amount of thermal deformation caused by the welding construction should be limited within the specified range of the design. Only in this way can the future be ensured. The work went smoothly.
Copyright© 2007-2013 NO.6 Electric Mall All Rights Reserved