Equipped with different power, different melting time, the smaller the capacity, the larger the configuration power, the faster the melting speed, the larger the furnace capacity and the higher the power. Depending on the furnace capacity and raw materials, it usually takes 80-90 minutes for 12-20 tons.
Copyright© 2007-2013 NO.6 Electric Mall All Rights Reserved