Problems in the use of wintersteel melting induction furnace
Before the arrival of winter, the inner circulating water should be replaced with antifreeze or other non-icing liquid to prevent freezing and to freeze the water-cooled copper tube.
Due to the low temperature in winter, the water pipe in the electric plate will become hard due to the temperature drop. Under the same pressure, the water pressure clamp of the pipe joint will seep and leak due to temperature changes. Therefore, winter should be specially checked. Water traps are everywhere to prevent water leakage, dripping onto charged boards such as circuit boards and thyristors, causing problems such as short circuit and fire, damage to thyristors, circuit boards, etc., causing failure of steel melting induction furnaces, affecting normal Production.
In the use of winter steel melting induction furnace, it is also necessary to pay attention to the fact that especially in the case of extremely cold weather, after the steel melting induction furnace is started, the electric disk should be operated in a low power state for 5-10 minutes to make the circuit board. The components, thyristors, modules, etc. are preheated, and then work according to the normal operating procedures, so as to avoid the components in the low temperature state, the temperature of the components is too low, and the best working condition is not caused.
Copyright© 2007-2013 NO.6 Electric Mall All Rights Reserved