Preparation for the installation of the intermediate frequency furnace

Time: 2019-05-25

Preparation for the installation of theintermediate frequency furnace

Before installation, all components of the plant must be inspected, the main components of the furnace and their mounting materials are complete, and their condition checked. Defects caused by improper transportation and storage of some components and materials shall be repaired so that all equipment, components, and corresponding materials and parts are intact, so as to ensure the smooth operation of future installation and commissioning work.

In addition, check and accept the various civil facilities related to the furnace equipment, such as checking whether the main dimensions in the floor plan are correct; check whether the basic equipment, trenches and embedded parts required for the installation of various electrical equipment and main busbars are in conformity with the design. It is required that the furnace foundation, platform elevation, vertical axis and horizontal axis deviation, anchor screw position, etc. are within the specified size range; check whether the construction quality of the base and platform meets the requirements. The installation and commissioning of the furnace can only be carried out after the above preparatory work is completed.



Understand Wikipedia: induction furnace
Recommended Reading: Medium Frequency Furnace
Recommended Reading: intermediate frequency furnace​
Similar Video
Similar Products