Φ20-Φ32 epoxy powder coating anti-corrosion production line process requirements
Workpiece: Φ20-Φ32 × 10m
Coating requirements: epoxy powder coating 400-500um
Process line speed: 3-4m/ min
Φ 20 -Φ 32 epoxy powder coating anti-corrosion production line mechanical description
Transmission line length of 40 m, containing eight 4.0 m × 0.8 yards gear frame; bracket base and the drive wheel 10 in all channel welded total length of 40 m #.
Φ 20 -Φ 32 epoxy powder coating anti-corrosion production line medium frequency induction heating equipment selection :
Equipment type KGPS-250/1 | Technical indicators | ||
Equipment rated power | 250KW | ||
Phase voltage | 380V | ||
Rated output voltage | 750V | ||
Rated output current | 500A | ||
Complete configuration list: | Control panel | Model 787 2.7 | |
Circuit breaker (Delixi) | DW15-630 | ||
Rectified thyristor | KP500A | ||
Inverter thyristor | KK500A | ||
Reactor | Ø12 tube, inner diameter Ø190 | ||
Manual information | One |
Φ20—Φ32 epoxy powder coating anti-corrosion production line electrostatic spraying equipment selection :
Gun control center DK type , the above device contains 4 automatic spray guns , the spray gun is built-in high pressure, the control cabinet controls the voltage, current and gas path system of 4 automatic spray guns, and controls the venturi powder supply pump powder supply system. The above device contains 1 set offluidized bed powder supply system . The size of the fluidized bed : (L × W × H) 800 × 775 × 570 (mm) contains 4 venturi powder pumps.
Φ 20 —Φ 32 epoxy powder coating anti-corrosion production line pipe system:
Upper and lower fork tube 4, a cylinder 4 and a control system. (including solenoid valves, valve blocks, PVC air pipes, control buttons, etc.).
The production cycle is 25 days, and the installation cycle is 10 days when conditions are met .
Φ 20 —Φ 32 epoxy powder coating anti-corrosion production line powder spraying equipment:
4 gun control cabinet DK type 1 set
4 gun barrel fluidization 1 (Including four Venturi pump for powder)
1 set of gun frame adjustment mechanism
A powder room
1 set of recovery unit (cyclone, filter level 2 recovery)