Ф219—Ф1219 elbow epoxy powder coating anti-corrosion pro
Ф720-Ф1600 steel pipe epoxy powder coating anti-corrosion p
Ф219—Ф820 steel pipe epoxy powder coating anti-corrosion
Ф108—Ф1016 steel pipe epoxy powder coating anti-corros
Φ159-Φ219 steel pipe single layer epoxy powder coating ant
Φ60-Φ273 steel pipe outer wall epoxy powder coating produc
Φ60-Φ219 steel pipe outer wall epoxy powder coating produc
Φ60—Φ140 steel pipe epoxy powder coating anti-corrosi
Φ20—Φ32 steel pipe epoxy powder coating anti-corrosion
Ф108—Ф1016 Steel Pipe Single Layer Epoxy Powder Spraying
Φ48-Φ159 steel tube epoxy powder coating anti-corrosion proThe project content:
Ф108—Ф1016 steel pipe single layer epoxy powder coating anti-corrosion production line
Ф108—Ф1016 steel pipe single layer epoxy powder coating anti-corrosion production line design basis:
Steel pipe diameter: Ф108—Ф1016
Steel pipe length: 8000 mm -12000 mm
Process speed: 1200 mm / min - 5000 mm / min

Ф108—Ф1016 steel pipe single layer epoxy powder coating anti-corrosion production line pipe conveyor
According to the user's request, our company's single-layer epoxy powder coating Ф108-Ф1016 steel pipe anti-corrosion production line is designed as a transmission line with single wheel as the power unit.
The descaling machine:
The new steel pipe outer wall shot blasting equipment can remove the rust and scale on the surface of the steel pipe, completely meet the cleaning requirements before the outer wall of the steel pipe is coated, and can meet the cleaning requirements of the outer wall of the large and medium-sized engineering steel pipe.
Ф108—Ф1016 steel pipe single layer epoxy powder coating anti-corrosion production line medium frequency heating selection :
This production line is equipped with two intermediate frequency heating devices of 500KW and 1000KW.
Ф108—Ф1016 steel pipe single layer epoxy powder coating anti-corrosion production line medium frequency induction heating power supply 500kw parameter selection :
name | parameter | name | parameter |
Input voltage | 380V | Output maximum voltage | 780V |
Input Current | 820A | Output maximum current | 1000A |
Input frequency | 50HZ | Output frequency | 500HZ~800HZ |
Ф108—Ф1016 steel pipe single layer epoxy powder coating anti-corrosion production line medium frequency induction heating power supply 1000kw parameter selection :
name | parameter | name | parameter |
Input voltage | 380V | Output maximum voltage | 780V |
Input Current | 1700A | Output maximum current | 2000A |
Input frequency | 50HZ | Output frequency | 500HZ~800HZ |
Ф108—Ф1016 steel pipe single layer epoxy powder coating anti-corrosion production line dusting system selection :
8 gun control center. 2 sets of DK type Each set contains 8 automatic spray guns, the spray gun is built-in high pressure, and the control cabinet controls the voltage, current and pneumatic system of 8 automatic spray guns. And control 8 venturi powder pump powder supply system. Each set of the above devices contains a fluidized bed powder supply system. The size of the fluidized bed: (L × W × H) 800 × 775 × 570 (mm) contains 8 venturi powder supply pumps.
Ф108—Ф1016 steel pipe single layer epoxy powder coating anti-corrosion production line water cooling room:
The water cooling room is closed by plastic steel glazing, which is beautiful and easy to observe. There are several activity windows on each side for easy access. The cooling water pump uses a flow rate of three cubic meters per hour (one standby). In addition, two intermediate frequency cooling water pumps have a flow rate of 25 cubic meters per hour. The cooling water pipe regulating valve is installed on the side of the operation cabinet for easy adjustment.
Eight, air compressor and pipe mechanism:
Nine, the release platform
Manufacturing and installation schedule
The production period is 50 days from the effective date of the contract, and the installation period is 20 days (the installation conditions are available)
Copyright© 2007-2013 NO.6 Electric Mall All Rights Reserved